Main Menu

Explore More

District Menu

The image displays the logo and text of the San Angelo Independent School District, along with information about a 2025 bond update scheduled for February 9th, 2026.
The image presents a timeline of bond projects for the San Angelo ISD, outlining various initiatives and their completion timelines from 2025 to 2029.
A timeline displaying various projects and their expected completion dates from 2025 to 2029, with different colored bars representing the different projects.
The image shows a rendering of a school building, with the San Angelo ISD Bond 2026 logo prominently displayed at the top. The text below provides an update on the Crockett Elementary Addition project, including details about the construction progress and upcoming work.
The image shows a construction site with concrete walls and steel structures in the foreground, and a crane lifting materials in the background.
The image shows an aerial view of a construction site, with several buildings and structures visible in the foreground and background. The site appears to be undergoing renovations or additions, as indicated by the %22NEW%22 and %22EXISTING%22 labels on the buildings.
The image shows the status and design development of the New Glenn Middle School project. It includes information about the architect, contractor, estimated completion date, and recent activities related to the project's design development phase.
The image shows a high school campus with various buildings, including a large, modern structure in the foreground, surrounded by smaller structures and a parking lot in the background.
The image shows a sprawling urban landscape with a mix of commercial and residential buildings, surrounded by a hilly, rural environment. In the foreground, there are several large, colorful structures, likely commercial or industrial facilities, while the background features a more residential area with smaller buildings and trees.
The image shows a sprawling urban landscape with a mix of commercial and residential buildings, surrounded by a hilly, rural environment. In the foreground, there are several large, colorful structures, likely commercial or industrial facilities, with a road running through the center of the frame.
A modern, multi-story building with an American flag flying atop stands in the foreground, surrounded by trees and a paved road with parked cars in the background.
A large, open indoor space with a colorful geometric ceiling design, wooden floors, and various musical instruments and equipment set up, suggesting it is likely a music rehearsal or performance venue.
The image shows a large industrial or commercial complex with several buildings, parking lots, and open spaces in the foreground, surrounded by a rural or suburban landscape in the background.
The image shows a large, modern school campus with several buildings, parking lots, and a grassy field in the background. In the foreground, there are several yellow school buses parked in the parking lot.
The image depicts a modern, multi-story building with a blue and gray color scheme, surrounded by a well-landscaped outdoor area with various plants and walkways.
A modern, open-plan interior space with a high ceiling, exposed steel beams, and large windows, featuring a mix of tables, chairs, and people engaged in various activities.
The image appears to be a floor plan or architectural rendering of a high school, showing the layout of various facilities such as an auditorium, gymnasium, kitchen/cafeteria, and a culinary lab.
The image appears to be a site plan or architectural drawing for an addition and renovation project at Lake View High School. It shows the proposed layout of the school grounds, including existing buildings, new construction, and landscaping elements.
A large, open indoor space with a high ceiling, wooden floors, and a complex geometric pattern of wooden beams and trusses overhead. The background features walls with windows and glass panels.
The image appears to be a schematic design plan for an addition and renovation project at a central high school. It includes various architectural elements, color-coded systems, and annotations detailing the proposed changes and improvements to the school's layout and infrastructure.
The image appears to be a schematic design for an addition and renovation project at a central high school, showcasing various elevations and sections of the proposed structure.
The image appears to be a schematic design for an addition and renovation project at a central high school. It includes various floor plans, elevations, and other architectural details related to the proposed construction work.
A large indoor sports arena with a wooden floor, bleachers, and a high ceiling with a complex truss system.
The image appears to be a schematic design plan for a central high school addition and renovation project, showcasing the layout and various sections of the building.
The image appears to be a schematic design for an addition and renovation project at a central high school. It shows a detailed floor plan layout, including a central gymnasium or auditorium space surrounded by various support and ancillary spaces.
The image appears to be a schematic design plan for a central high school addition and renovation project. It shows the layout of various rooms and facilities within the school, including a central gymnasium or sports court.
The image appears to be a site plan or layout diagram, featuring various shapes and structures arranged in a spatial configuration. The foreground includes geometric shapes and forms, while the background contains additional details and annotations.
A colorful and detailed architectural plan or layout of a sports facility, featuring a large oval-shaped playing field surrounded by various structures, pathways, and landscaping elements.
The image appears to be a floor plan or architectural diagram depicting the layout and organization of a multi-story building or complex. The foreground contains various colored sections and shapes representing different rooms, spaces, and features within the structure, while the background shows additional details and perspectives of the overall building.
The image appears to be architectural drawings or plans, depicting various elevations and sections of a building or structure. The drawings feature a grid-like layout with various geometric shapes and lines, suggesting a modern or minimalist architectural design.
The image appears to be a floor plan or layout diagram, depicting various sections or rooms within a building or structure. The different sections are represented by different colors and shapes, suggesting different functional areas or purposes.
Bond 2025 Construction Update – February 9, 2026

RJ Lopez with Parkhill provided an update on bond construction progress during the February 9 Pre-Agenda Board Meeting. Overall project timelines and campus opening dates remain on schedule, with several projects continuing to move forward across the district. 

Crockett Elementary

  • Construction is underway and remains on schedule for an August 2026 opening.
  • Structural steel, concrete walls, and entry canopy elements are now visible.
  • The new entry will connect between the classroom addition and the cafeteria.

McGill Elementary

  • Preparing to begin construction.
  • Asbestos abatement is underway.
  • Demolition of select existing structures will follow.
  • The project has received necessary permits and remains aligned with the overall opening timeline.

Fannin Elementary

  • Now tracked separately from McGill due to phasing differences
  • Bid and construction dates vary slightly, but the project remains aligned with the planned opening schedule.

Glenn Middle School

  • Continuing in detailed design phase.
  • The team is refining interior and exterior design elements.
  • More finalized design updates will be presented in the coming months.

Lake View High School

  • Design development is nearing final selections.
  • A fly-through video was shown:
    • The new Mariachi Hall addition on the west side of campus.
    • A new Career and Technical Education (CTE) addition on the east side, including wood shop, mechanic shop, and floral lab spaces.
    • A renovated entry connection to the gymnasium and auditorium.
    • Interior renderings highlighting purpose-built spaces with lockers, mirrors, and acoustic panels for fine arts programs.
  • Additional parking and a potential bus drive are being priced as alternates and may be included if the project remains within budget.

Central High School

  • Design work continues for additions and renovations.
  • The team is refining material selections and interior/exterior details.
  • Future updates will include more detailed renderings similar to those shared for Lake View.
  • A fast-tracked waterline project has been added to the schedule to reroute a main water line prior to demolition work planned for September.