The image presents a timeline of bond projects for the San Angelo ISD, outlining various initiatives and their completion timelines from 2025 to 2029.
The image presents a timeline of bond projects for the San Angelo ISD, outlining various projects and their timelines from 2025 to 2029.
The image shows a project status update for the Crockett Elementary Addition construction, including details about the recent activity and upcoming work. The background features the San Angelo ISD Bond 2025 logo and a 3D rendering of the building addition.
The image shows a construction site with a concrete foundation in the foreground and a large building structure in the background, along with various construction materials and equipment scattered around the site.
The image shows an aerial view of a campus or school complex, with various buildings and facilities visible in the foreground and background. The campus appears to be situated in a suburban or rural area, with surrounding hills and mountains visible in the distance.
The image shows a schematic design for the New Glenn Middle School, including details about the architect, contractor, and estimated completion date. The background of the image appears to be a rendering or architectural drawing of the school building.
The image shows a 3D rendering of a proposed addition and renovation project for Lake View High School, including architectural plans and design renderings.
The image appears to be a site plan or architectural drawing for a high school addition and renovation project. It shows the layout of the school building, surrounding landscape, and proposed changes, including new structures and landscaping elements.
A large, open indoor space with a high ceiling, wooden floors, and a complex geometric pattern of wooden beams and trusses overhead. The background features glass walls and windows, providing natural light and a view of the exterior.
The image appears to be a floor plan or schematic design for a high school addition and renovation project. It includes labeled sections for an auditorium, gymnasium, kitchen/cafeteria, and health science areas, along with details about the project's architect, contractor, and expected completion date.
An aerial view of a high school campus, with various buildings, parking lots, and outdoor facilities visible in the foreground and background.
The image appears to be a schematic design or site plan for a central high school addition and renovation project. It shows the layout of various buildings, structures, and outdoor spaces on the school campus, including a large central building, smaller surrounding structures, and open green areas.
The image appears to be a schematic design plan for an addition and renovation project at a central high school. It includes various sections and structures, as well as landscaping elements such as trees and greenery.
The image appears to be a schematic design for the addition and renovation of a central high school, showing the layout of various facilities such as an auditorium, gymnasium, kitchen/cafeteria, and health science areas.
The image appears to be a schematic design plan for an addition and renovation project at a central high school. It includes various architectural elements, color-coded annotations, and a layout of the school's campus.
The image appears to be a schematic design for an addition and renovation project at a central high school, showcasing various elevations and cross-sections of the proposed structure.
The image appears to be a schematic design for an addition and renovation project at a central high school, showing various floor plans, elevations, and other architectural details.
A large indoor sports arena with a wooden floor, bleachers, and a high ceiling with a complex truss system.
The image appears to be a schematic design plan for an addition and renovation project at a central high school, showing the layout and various rooms within the building.
The image appears to be a schematic design for a central high school addition and renovation project. It shows a detailed floor plan layout, including a central gymnasium or auditorium space surrounded by various other rooms and facilities.
The image appears to be a schematic design plan for a central high school addition and renovation project. It shows the layout of various rooms and facilities within the school, including a central gymnasium or sports court surrounded by classrooms, offices, and other support spaces.
The image appears to be a site plan or architectural drawing, depicting a layout of buildings, roads, and landscaping elements. The foreground features various geometric shapes and structures, while the background includes additional details such as roads and vegetation.
A colorful and detailed illustration depicting a sports stadium or arena, with a football field in the center surrounded by various structures, seating areas, and landscaping elements.
The image appears to be a floor plan or architectural diagram depicting the layout and organization of a multi-story building or complex. The foreground contains various colored sections and shapes representing different rooms, spaces, and features within the structure, while the background shows additional details and perspectives of the overall building design.
The image appears to be architectural drawings or plans, depicting various elevations and sections of a building or structure. The drawings feature a grid-like layout with various geometric shapes and lines, suggesting a modern or minimalist architectural design.
The image presents a detailed floor plan or layout of a building, showcasing various sections and their respective dimensions.
Bond 2025 Construction Update — January 12, 2026

RJ Lopez from Parkhill Architects provided a monthly update on Bond 2025 construction and design progress during the January 12, 2026 pre-agenda board meeting. Overall, projects remain on schedule and are moving from early planning into more detailed design and active construction phases.

Crockett Elementary School

  • Actively under construction.

  • Concrete block construction is underway; the kitchen exterior is complete.

  • Structural steel is on site, and framing is set to begin with cranes already mobilized.

  • Project remains on track to open in August 2026, confirmed the day of the meeting.

McGill Elementary School

  • Bid process is progressing well, with strong contractor interest.

  • Ten contractors picked up drawings; five bids were officially submitted.

  • Board action on bids was scheduled later in the meeting.

  • Design highlights shown to the board included:

    • New library and administrative spaces.

    • Additional classroom wings, music room, maker space, and STEM areas.

    • Campus consolidation that brings most instructional spaces under one roof.

    • Expanded parking and a new drop-off drive on the back side of the campus.

  • Site plan permitting is nearly complete, allowing for immediate mobilization once bids are awarded.

Glenn Middle School

  • Design work is advancing from general massing concepts to more refined layouts.

  • Interior space locations and exterior design elements are being further defined.

  • Over the coming months, materials such as glass and brick will be selected.

  • More detailed, lifelike renderings will be presented as design decisions are finalized with stakeholders.

Lake View High School

  • Schematic designs are progressing toward material selection and realistic renderings.

  • Site planning updates shown included:

    • Additional parking and a new drop-off drive on the west side to improve access for events at the gym and auditorium.

    • Reduced need for pedestrians to cross the street from the main circular drive.

    • A new bus drive on the east side near the JROTC and classroom wing, accommodating approximately eight buses.

    • Covered walkways connecting academic buildings and CTE facilities.

  • Early interior concept images were shared for the new Mariachi Hall, showing:

    • Storage cabinetry and functional layouts.

    • Mirror walls for performance practice.

    • Acoustic treatments, potential color schemes, window integration, and a wood practice floor.

Central High School

  • Updated renderings showed refined layouts with seating capacities now included:

    • Auditorium: approximately 1,000 seats.

    • Gymnasium: approximately 2,200 seats.

    • Cafeteria: approximately 1,000 seats.

  • Plans include a new cafeteria, kitchen, culinary lab, and health science lab.

  • Corridor layouts were adjusted to create a larger central connector between the gymnasium and cafeteria to better support daily student circulation and future campus phases.

  • Site and floor plan overlays were shown, illustrating how the new auditorium, gym, and dining facilities integrate near Tucker Hall.

  • Construction phasing will be coordinated to allow continued use of existing facilities where possible, with demolition of the current auditorium expected as an early step.

Parkhill noted that the district has made significant progress across all projects and will continue refining designs, coordinating phasing, and bringing forward updated renderings and construction milestones in future board meetings.