Main Menu

Explore More

District Menu

This is a blueprint or architectural plan for a building or structure, showing various rooms, spaces, and layout details.
A grassy field with various sports equipment and structures, including a tennis court, basketball hoop, and other recreational elements.
A playground with various colorful play equipment, including a slide, swings, and other structures, set on a grassy field.
A colorful and playful playground equipment with various shapes and textures, set against a grassy background.
An aerial view of a modern school building with a flat roof, surrounded by a desert landscape with sparse vegetation in the background.
The image depicts a modern, single-story school building with a blue and gray color scheme, surrounded by a fenced-in outdoor area with a paved surface, likely a playground or sports court.
Bond Construction Update – April 20, 2026

Brooks Wehner with KFW Architects provided an update on bond construction progress during the April 20, 2026 Regular Board Meeting.

Fannin Elementary School

  • The project has reached the 65% design phase, with plans recently submitted to the city.
  • The project remains on schedule based on current timelines.
  • New playground concepts were introduced for consideration, including:
    • Interactive climbing features designed to encourage active play.
    • Design elements aligned with the school’s colors (blue and gold).
    • The playground design is not yet finalized and is still under review.
    • Costs are expected to remain consistent with playgrounds at other campuses.

Lake View High School

  • Bids have been received for the new concession building, with board action scheduled.
  • The project includes a new concession and ticketing facility featuring:
    • Ticket booth at the front entrance
    • Concession serving areas
    • Restrooms
    • Officials’ dressing areas
  • The building will use energy-efficient materials with integrated insulation.
  • This project is part of broader athletics upgrades at Lake View, including:
    • Turf replacements for baseball and softball fields
    • Track resurfacing
    • Improvements to the football/soccer field
    • New lighting and additional seating
    • Expanded parking near the athletic facilities
  • The new concession facility is separate from the existing portable building used for student meals, which remains in use.