A white background displays the %22SAN ANGELO ISD BUILDING FUTURE-READY GRADUATES%22 logo and text in the upper portion, with %222025 Bond Update%22 and the date %22August 10, 2026%22 centered below, alongside smaller logos for %22SAN ANGELO ISD BOND 2025%22 and %22Parkhill%22 in the lower corners.
A timeline of San Angelo ISD's 2025 bond projects is presented against a white background with a blue and yellow logo at the top.
A timeline chart displays San Angelo ISD's 2025 bond projects with colored bars indicating design, bidding, construction, and move-in phases from 2025 to 2029.
A project status update for Crockett Elementary Addition is presented with a 3D rendering of the building in the background.
The left side shows a brick building under construction with scaffolding, while the right side displays a completed playground with artificial turf and a climbing structure.
The foreground shows a classroom with a whiteboard and a window, while the background reveals a wall with hooks and a covered object.
In the foreground, blue tape marks off an area on a gray floor with stacks of boxes, while the background shows a hallway with doors and a tiled wall in a room with exposed ceiling tiles.
An aerial view shows the McGill Elementary Phase II Addition under construction, with recent activities listed on the left.
Two photos show the construction progress of McGill Elementary Phase II Addition, with the left image displaying the exterior and playground area and the right image showing the interior framing and ductwork.
Construction is underway for the McGill Elementary Phase II Addition, with concrete foundations and building structures visible in the foreground and background under a cloudy sky.
A modern brick building with a prominent school logo is shown in the background, while the foreground displays text detailing project information for New Glenn Middle School.
Students gather in a bright, modern school atrium with a central staircase and upper-level walkways, while a blue and white exterior wall frames the scene.
Students are in a modern library with bookshelves and seating in the foreground, while the background shows large windows and architectural details of New Glenn Middle School.
A modern gymnasium with basketball courts and bleacher seating is shown, with %22New Glenn Middle School%22 and %22Status: Bid Phase%22 visible at the top.
A modern, well-equipped gymnasium with weight machines in the foreground and rows of weight racks and dumbbells in the background, all under fluorescent lighting.
A modern classroom with students at desks in the foreground and a teacher at the front, with %22New Glenn Middle School%22 and %22Status: Bid Phase%22 visible in the background.
A rendering of the Lake View High School addition and renovation project shows a modern building with a parking lot in the foreground and a blue sky with clouds in the background.
A blueprint of Central High School's addition and renovation project, detailing the auditorium, gymnasium, kitchen/cafeteria, health science, and culinary lab, is presented with project status, architect, contractor, and completion date information in the background.
A floor plan refinement shows the addition and renovation of Central High School, with the foreground displaying a detailed layout of various school facilities and the background indicating the overall project title.
A blueprint of a school campus shows a new waterline in blue and an existing waterline in yellow, with buildings and roads detailed in the background.
Construction prep work is underway at Central High School, with a paved walkway and trees in the foreground and a building with vehicles in the background.
A modern school building with a parking lot in the foreground and a cloudy sky in the background.
Cars are parked in the foreground of a modern, multi-story school building with a large entrance and surrounding landscaping under a cloudy sky.
A rendering of a modern auditorium with tiered seating filled with students in the foreground and a stage with blue curtains in the background.
A brightly lit basketball court with bleachers full of spectators fills the foreground, while the background reveals the expansive ceiling and structural elements of a large gymnasium.
Students walk through a modern, multi-level school lobby with tiered seating in the background.
Students walk up a grand staircase in a modern school lobby with wood paneling and a striking blue and white chandelier.
A white background displays %22THANK YOU!%22 in large blue text above %22SAN ANGELO ISD BUILDING FUTURE-READY GRADUATES%22 in blue and yellow, with the San Angelo ISD logo on the right, while the bottom features %222025 Bond Update%22 and %22August 10, 2026%22 in black text, along with the San Angelo ISD Bond 2025 logo on the left and the Parkhill logo on the right.
Bond Construction Update – August 10, 2026

RJ Lopez of Parkhill Architects provided an update on 2025 Bond construction progress during the August 10, 2026, Preagenda Board Meeting. Bond projects remain on schedule, with construction activity increasing across the district.

Crockett Elementary

  • The new classroom addition is expected to receive its certificate of occupancy in time for the start of the 2026–27 school year.
  • Classrooms are substantially complete, with touch-up painting and punch-list work underway.
  • Three of the new classrooms will be used this school year, with the remaining space available to accommodate increased enrollment in the future.
  • Work continues on the new kitchen and cafeteria, which are expected to be completed before the end of August.
  • The campus will continue using its existing fully functioning kitchen and cafeteria until the new facilities are complete.
  • Playground areas are ready for use, and additional exterior work, including handrails and parking improvements, continues.

McGill Elementary

  • Construction continues on the new administrative, nurse and library addition.
  • Structural steel is going up and roof decking is being installed.
  • Concrete slabs are being poured for the classroom addition, making the overall footprint of the expanded campus more visible.

New Glenn Middle School

  • The project is reaching another major milestone as the Guaranteed Maximum Price (GMP) moves forward for approval, allowing construction to begin.
  • The construction trailer is already on site, with crews prepared to begin moving dirt following approval.
  • The project is currently approximately $3 million under its construction budget, with additional contingency funds outside of that amount.
  • Portions of the city's design review have already been approved, helping the project remain on schedule.
  • New renderings highlighted the two-story commons, library, competition gym, weight room, classrooms and main entrance.
  • The commons will feature natural light through durable translucent fiberglass roof panels designed to provide insulation and withstand severe weather.
  • The new competition gym will include bleachers on both sides, cross-court configurations and controlled natural lighting.

Lake View High School

  • The project is moving into the construction phase.
  • Portable facilities and site fencing are in place.
  • Visible site work and dirt movement are expected to begin as construction activity increases.

Central High School

  • Design refinement continues for the Health Science and Culinary Arts instructional spaces based on recent meetings and planning.
  • The campus water line relocation has been completed, removing the active main water line that previously ran through the middle of the campus.
  • Early demolition and preparation work has begun in areas of the campus ahead of the next phase of construction.
  • Updated renderings highlighted the new cafeteria entrance, auditorium, gymnasium, commons area and auditorium lobby.
  • The new auditorium is being designed with improved acoustics, lighting, curtains and other performance systems.
  • The new gymnasium will provide significantly more spectator capacity than the current facility.
  • Site improvements will also address longstanding drainage issues through new grading and drainage work across portions of the campus.