Main Menu

Explore More

District Menu

Various company logos are displayed on the left, while a 3D architectural rendering of a school building with students in a courtyard is shown on the right.
People gather in the foreground near a fenced area and concrete walkway in front of two modern concession and ticketing buildings under a cloudy sky.
A %22Construction Progress%22 heading and a bulleted list of installation tasks are positioned above a detailed architectural floor plan.
Concrete foundations and piping are being installed at a construction site under a bright, cloudy sky.
Construction workers pour concrete into a wooden frame at a night site with dark surroundings and distant lights.
A construction worker in a high-visibility shirt stands by a cinder block wall under a cloudy blue sky in the first image, while a dirt lot leads to a partially completed block building under a sunset sky in the second.
Children play on a colorful playground in the foreground, with a brick school building and a cloudy sky in the background.
A grassy lawn in the foreground leads to a modern red brick school building with children gathered near the entrance under a clear sky.
A %22Construction Progress%22 heading and a bulleted list of updates are positioned in the foreground above a detailed architectural blueprint of a building section in the background.
A black and white photo of a grassy yard with houses in the background is paired with a color photo of a dirt construction site next to a brick building under a cloudy sky.
Workers install a water line in a deep trench in the foreground, with construction equipment and a street scene in the background.
Two side-by-side photos show a patched utility line next to a sidewalk with a one-way sign on the left, and a dirt construction site with a white metal building in the background on the right.
A black and white photo of a grassy field with a picnic table in the foreground and buildings in the background, paired with a color photo of a rocky excavation site in the foreground and a brick building under a cloudy sky in the background.
Bond Construction Update – October 19, 2026

Brooks Wehner of KFW Architects provided an update on the progress of Bond 2025 construction projects at Lake View High School and Fannin Elementary School during the San Angelo ISD Board of Trustees Regular Meeting on October 19, 2026.

Lake View High School - Concession and Ticketing Buildings

  • Construction continues to progress, with nearly all underground utilities installed and the concrete foundation completed.
  • Approximately 85-90% of the exterior concrete masonry walls have been completed, and work is underway on interior walls.
  • Electrical and plumbing rough-in work is underway.
  • The next phase includes installation of the roof structure and roofing to enclose the building, allowing interior construction to advance.

Fannin Elementary School - Additions and Renovations

  • Site demolition is complete, including removal of the old portable buildings and preparation of the construction areas.
  • A new water line connection has been installed to serve the cafeteria's kitchen and fire sprinkler systems, as well as the sprinkler systems for the new classroom building and the eight-classroom addition completed in 2024.
  • A temporary sidewalk and new doorway have been installed to provide students with a safe route to the gym and multipurpose building during construction.
  • Crews are preparing building pads for both the new cafeteria and classroom buildings on opposite sides of campus.
  • Excavation and grading are underway at the classroom building site to bring the new construction area to the elevation of the existing building.
  • The architectural team continues reviewing contractor submittals to support timely material procurement and construction progress.