Main Menu

Explore More

District Menu

The image presents an architectural design plan for a school district, featuring a site map, building layout, and project details.
This appears to be an architectural floor plan or blueprint, displaying a detailed layout of a building or structure. The foreground contains various geometric shapes, lines, and labels indicating the different rooms, spaces, and features of the structure. The background is a plain white space, providing a clear and uncluttered view of the floor plan.
The image depicts a new concessions and ticketing building for Lake View High School, with a vicinity map and various architectural details and specifications provided.
This appears to be an architectural floor plan or blueprint, displaying the layout and dimensions of a building or structure. The plan includes various rooms, walls, and other structural elements, providing a detailed schematic representation of the space.
The image displays the logo and text of the San Angelo Independent School District, which states %22Building Future-Ready Graduates%22 and includes the year 2025 Bond Update information.
The image presents a timeline of bond projects for the San Angelo ISD, outlining various initiatives and their completion timelines from 2025 to 2029.
The image presents a timeline of various bond projects planned for the years 2025 to 2029, with different projects represented by colored bars indicating their respective timelines.
The image shows a project status update for the Crockett Elementary Addition construction, including details about the architect, contractor, estimated completion date, and recent activities such as brick installation, waterproofing, and electrical/plumbing/mechanical work. The background features a 3D rendering of the planned addition.
The image shows a construction site with a large building under construction, surrounded by piles of bricks and a pickup truck in the foreground.
A construction site with a partially completed building, scaffolding, and a sign indicating %22Crockett - Brick and waterproofing%22 in the foreground, set against a clear blue sky in the background.
The image shows an aerial view of a construction site for the McGill Elementary Phase II Addition project, with various buildings, equipment, and activities visible.
The image shows the construction progress of the McGill Elementary Phase II Addition project, with various stages of construction visible, including a partially completed building structure, an excavated area, and construction equipment on site.
The image shows the exterior of a school building, with a sign indicating it is the New Glenn Middle School. The building has a modern, brick and glass design, and the foreground includes landscaping elements such as plants and shrubs.
The image shows a modern, multi-story school building with a large entrance and landscaped grounds in the foreground, set against a cloudy sky in the background.
A modern, multi-story school building with a courtyard and landscaping in the foreground, set against a clear sky in the background.
The image shows the exterior of a school building, with a road and parked cars in the foreground. The building appears to be undergoing construction or renovation, as indicated by the %22Lake View High School Addition and Renovation%22 text.
The image shows the interior of a high school building, with a large, colorful geometric ceiling design and a group of people standing in the foreground.
The image provides a floor plan and details for a Central High School addition and renovation project, including information about the status, architect, contractor, estimated completion date, and various spaces such as an auditorium, gymnasium, kitchen/cafeteria, and health science area.
A complex architectural sketch depicting various structures, including a large building with multiple levels, surrounded by a mountainous landscape with various annotations and labels.
The image appears to be a design development sketch for a Central High School addition and renovation project, showing various architectural plans and elevations with annotations.
The image displays the logo and slogan of the San Angelo Independent School District, along with a %222025 Bond Update%22 announcement and a %22Parkhill%22 logo in the bottom right corner.
The image is a pie chart that displays the bond budgets allocated to various project packages, with a legend providing details about each package.
The image displays the logo and slogan of the San Angelo Independent School District, which aims to build future-ready graduates.
The image shows a group of people, likely students and staff, standing in front of a school building with a %22McGill Elementary School%22 sign visible.
The image shows a sprawling urban landscape with a mix of commercial and residential buildings, surrounded by a hilly terrain and a cloudy sky.
A modern, multi-story building with an American flag flying atop, surrounded by a landscaped area with trees and a roundabout in the foreground.
An aerial view of a large industrial or commercial complex with several buildings, parking lots, and open spaces in the foreground and background.
The image shows a large, modern school campus with several buildings, parking lots, and a grassy field in the background. In the foreground, there are several yellow school buses parked in the parking lot.
The image depicts a modern, multi-story building with a blue and gray color scheme, surrounded by a well-landscaped outdoor area with various plants and walkways.
A modern, open-plan interior space with a high ceiling, exposed steel beams, and large windows allowing natural light to flood the area. The foreground features a seating area with tables and chairs, while the background shows people moving around the space.
The image appears to be a site plan or architectural drawing for an addition and renovation project at Lake View High School. It shows the proposed layout of the school building, surrounding landscape, and other structures on the property.
A large, open indoor space with a high ceiling, wooden floors, and a complex geometric pattern of wooden beams and trusses overhead. The background features walls with windows and glass panels.
The image appears to be a schematic design plan for an addition and renovation project at a central high school. It includes various architectural elements, color-coded annotations, and a layout of the school's grounds and surrounding infrastructure.
The image appears to be a schematic design for an addition and renovation project at a central high school, showing various elevations and cross-sections of the proposed structure.
The image appears to be a schematic design for an addition and renovation project at a central high school, showing various floor plans, elevations, and other architectural details.
A large indoor sports arena with a wooden floor, bleachers, and a high ceiling with a complex truss system.
The image appears to be a schematic design plan for an addition and renovation project at a central high school, showing the layout and various rooms and spaces within the building.
The image appears to be a schematic design for an addition and renovation project at a central high school. It shows a detailed floor plan layout, including a central basketball court surrounded by seating areas and various support spaces.
The image appears to be a schematic design plan for a central high school addition and renovation project. It shows the layout of various rooms and facilities within the school, including a central gymnasium or sports court surrounded by classrooms, offices, and other support spaces.
The image appears to be a site plan or layout diagram, featuring various shapes and structures arranged in a spatial configuration. The foreground includes geometric shapes and forms, while the background contains additional details and annotations.
A colorful and detailed illustration depicting a sports stadium or arena, with a football field in the center surrounded by various structures, seating areas, and landscaping elements.
The image appears to be a floor plan or architectural diagram of a multi-story building, with various rooms and spaces labeled and color-coded.
The image appears to be architectural drawings or plans, depicting various elevations and sections of a building or structure. The drawings feature a grid-like layout with various geometric shapes and lines, suggesting a modern or minimalist architectural design.
The image appears to be a floor plan or layout diagram, displaying various sections and rooms within a building or structure. The different sections are represented by colored blocks, each with its own label or designation.
Bond Construction Update – March 26, 2026

Representatives from Parkhill and KFW Architects provided updates on multiple Bond 2025 projects during the March 26 Regular Board Meeting, highlighting continued progress across the district.

Fannin Elementary (KFW Architects)

  • Design development phase is complete; construction documents are scheduled for completion by May 29.
  • Project includes:
    • New classroom building with 10 classrooms (with potential to expand to 12 if budget allows)
    • New cafeteria building
  • Construction manager selection is underway to prepare for the next phase.
  • Future phases may repurpose existing structures into administrative and support spaces.

Lake View High School – Baseball/Softball Complex (KFW Architects)

  • New ticket booth and concession building progressing, including:
    • Concessions, restrooms, and officials’ dressing rooms
    • Expanded parking area
  • Construction documents have been completed, with contractor selection expected soon.
  • Coordination is underway with other projects on site, including future field lighting.

Crockett Elementary (Parkhill)

  • Construction is well underway:
    • Brickwork and structural elements are visible
    • Enclosure of the building is approaching, which will allow interior work to begin

McGill Elementary (Parkhill)

  • Demolition is complete, and the site is being prepared for new construction.
  • Utilities and early construction work are in progress following full permitting approval.

Glenn Middle School (Parkhill)

  • Design development continues, with updated exterior concepts presented.
  • Current plans include:
    • Central main entry with administrative and library spaces
    • Separate wings for academics and athletics
  • Ongoing work includes site layout details such as traffic flow and landscaping.

Lake View High School - Main Campus Projects (Parkhill)

  • Design refinements continue, including adjustments to improve efficiency while maintaining key features.
  • Updates to the Mariachi Hall design and exterior elements are being evaluated with a focus on durability and long-term performance.

Central High School (Parkhill)

  • Early design concepts and planning studies are underway.
  • Architects are exploring building layout, materials, and orientation to best fit the campus and environment.
  • Multiple design options are being developed and will be narrowed down in future presentations.

Overall, projects across the district continue to move forward in various stages of design and construction, with visible progress on multiple campuses and continued planning for future phases.

Bond 2025 Updates